TOVP Architecture Department Report – March, 2022 We are in that...



TOVP Architecture Department Report – March, 2022
We are in that phase of the project where the architectural drawings, although complete, are entering their next re-construction phase. This phase (often referred to as the ‘Invisible Phase’) is to ensure that the minutest inch increase in the brick and plaster is re-constructed in the drawing, because it has a domino impact on the flooring, then the ceiling, and eventually on the entire gamut of services and aesthetical layers which are shortly underway.

You will also be relieved to know that as the building is reaching completion, the Architecture Team is constantly at their desks coordinating closely with the Construction Team and Cushman & Wakefield to ensure that there is a similar movement of spaces in the drawing, as is on the site… For some years down the line, accurate and holistic drawings will be available for any kind of maintenance.

Hare Krishna!

Click here to read the entire article in your browser or download a copy to your desktop for offline reading: https://cdn.tovp.org/wp-content/uploads/2022/03/2022-03-16-architectural-report-tovp.pdf

Archive

Show more